Day 5 of Kitchen Floor and Master Suite Remodel
Day 5 and the kitchen floor is grouted. Love the progress!
The master bathroom is also taking shape. The shower stall is drywalled and waterproofed. A little work began to remove the closet door to drywall.
Greg and I spent the afternoon meeting with cabinet and countertop makers. We selected bedroom carpet and narrowed down bathroom tile selections.
Comments
Post a Comment