Wednesday, February 21, 2018

Day 7 of Kitchen Floor and Master Suite Remodel

The contractor returned today.  

In the master suite, more prepping for tile installation on the floor.  Lots of plaster repair for future painting.







In the kitchen, more plaster repair work.

Tonight, Greg moved the stove back into place, after a little floor adjustment in order to plug it in.  Quinn can eat quesadillas again.  Small details.


Monday, February 19, 2018

Day 6 of Master Suite Remodel (Kitchen gets a day off)

Came home today to some master suite actions checked off of the list.

 drywall mudded in bathroom

 prepping shower to be tiled

drywalled and mudded the former closet door


Recommendation to anyone with a sneaky 5 year old boy...don't store the toilet in the closet.  Remember, they used to call the bathroom a water closet.  Luckily we stopped him before he used it.




Tomorrow the house will have a day of rest.  Renovations will continue on Wednesday.d


Friday, February 16, 2018

Day 5 of Kitchen Floor and Master Suite Remodel

Day 5 and the kitchen floor is grouted.  Love the progress!



The master bathroom is also taking shape.  The shower stall is drywalled and waterproofed.  A little work began to remove the closet door to drywall.




Greg and I spent the afternoon meeting with cabinet and countertop makers.  We selected bedroom carpet and narrowed down bathroom tile selections. 

Day 4 of Kitchen Floor and Master Suite Remodel

Day 4 of the remodel and the kitchen is completely tiled!!


Day 3 of Kitchen Floor and Master Suite Remodel

Day 3 of the remodel included the start of tiling in the kitchen.  We decided that shower needed to be a little larger so had to redo some of the plumbing to support.








Day 2 of Kitchen Floor and Master Suite Remodel

Day 2 the kitchen subfloor returned...no more view to the basement! Also began laying the tile underlayment.



In the bathroom, began expanding the shower location and installing some plumbing.


Day 1 of Kitchen Floor and Master Suite Remodel

Demolition Day sums up day 1 of our Kitchen floor and master suite renovation.

The kitchen floor was taken down to the joists.  The end goal will be a smooth transition from the kitchen floor to the dining floor.  Previously there were multiple layers of floor causing a height difference.


The bathroom was gutted and shower removed.