Day 7 of Kitchen Floor and Master Suite Remodel

The contractor returned today.  

In the master suite, more prepping for tile installation on the floor.  Lots of plaster repair for future painting.







In the kitchen, more plaster repair work.

Tonight, Greg moved the stove back into place, after a little floor adjustment in order to plug it in.  Quinn can eat quesadillas again.  Small details.


Comments

Popular Posts