Hall Bath Renovation: Day 3

Plumbing related work began today.

 The toilet was removed.

New toilet location next to old location.  You can see the kitchen below.

This is what the same hole looks like from the kitchen looking up at the ceiling.
  
Preparing the tub surround to install subway tile.  This is the end where the tub faucet and shower head will be located.

The tub's existing overflow drain.  It's silly but I'll be sad to see it go.  I may need to keep it and and convert it to a new use...maybe a Christmas ornament.  Quinn thinks it looks like a clock so during bath time we would jokingly argue whether it's a clock or drain.  Silly but I loved it.

 The plumbing from the bathroom goes down through our dining room.  When the plumbing work is done, the pipes be enclosed behind drywall.